The ongoing saga of being paid the Victorian Premium Feed-in Tariff for the net electricity that I export into the grid from my Solar PV system is finally over (I hope).
Since this post, titled ‘How Hard Is It…’, many things have transpired. Firstly, I was called by Origin new connections and they confirmed that my new electricity meter would be installed on January 8th, between 1200-1600. So far so good, I thought because we were getting a bit of action, but two weeks later than I expected. Apparently, the 21 days was for them to contact me with a date, not to install the meter.
I worked from home on the 8th waiting in anticipation, only to be disappointed at 1600 when no one from Powercor, who were to perform the installation, turned up. I jumped straight on the phone to Origin to get them to sort it out. I received a call back in about 10 minutes telling me that Powercor had computer issues and my work request had failed to be sent to the installation team. I asked for Powercor’s direct number because my beef was not with Origin, and so that I could rip them a new one (hey it worked once already). I talked to Powercor’s new connections team, who duly apologised in the lamest possible way, and proceeded to book me into the next available installation slot of the 8th of February. Well, to say that I lost the plot was an understatement. Kim said that she could see steam coming out of my ears. The poor bloke on the other end didn’t know what hit him as I promised to get the Electrical Ombudsman involved for loss of earnings. He began to back pedal really fast and said that he will check with his supervisor to see if they could fit me in earlier. Hell, that felt good!
Twenty minutes later, I get a call back from Powercor. The apology was much more sincere this time, and they told me that they could now fit me in on the 21st of January from 1200-1600, and they were going to wave the $167 installation fee. Well that was much better! I accepted their proposal, and apologised to the bloke for loosing my nut, and he said that it was he who should be apologising again and not I! Nice touch.
Anyway, Kim rang up Powercor on the 20th to confirm that everything was going to plan. They told her that the installation was scheduled for the 8th of Feb (OMG!), whereby she duly pointed out that NO that was not the right date and that we were scheduled in for the 21st of Jan. They quickly realised their error, checked with the installation team to ensure that we were on their list for the next day, and told Kim that they would be in big trouble if they stuffed up this one again. I wonder who they were going to be in trouble with, me or the Ombudsman?
I was to work from home again on the 21st of Jan, and to my surprise on the way home, Kim called to inform me that the installation team had already turned up at 1030, and hour and a half early. Instead of one hour of downtime, they completed the job in 15 minutes flat and even gave us some instructions on how it worked to boot. Kim said that one of the installers looked like a young Brad Pitt, so that made her day!
So what was all the fuss about? Well, in December 2009, after much public pressure and lobbying by environmental groups, the Victorian parliament passed legislation that forced electricity retailers to pay small generators ( PV systems <5 kw peak), a premium feed-in tariff of 60c per net kilowatt hour for electricity exported into the power grid. However, credits built up over the year by the small generator would be reset, or effectively cancelled, at the end of each calendar year with a potential loss of thousands of dollars. The retailers took this up immediately, with the larger ones like Origin and AGL offering 66c and 68c respectively, and they promised that they would roll over credits year to year and pay them out upon customer request once the credits available was greater than $50. AGL got away with a larger tariff because they charge a $10 admin fee for the credit transaction. As low handed as a bank, I reckon and it pays to read the small print.
I signed the feed-in tariff with Origin in December 2009 after confirming that they had no administration fee, listed the 8th of Jan as the start date of the agreement (even though I didn’t technically get the meter until the 21st). Straight after the meter was installed, after I had finished staring at it clocking up exported kWh’s, I called Origin sales to confirm that the agreement was in place. Low and behold, it was effective immediately and that any electricity I imported from the grid was 100% GreenPower wind generated. So, once again, my power is officially all carbon neutral, which is important to me in a Greening of Gavin sort of way.
So far, as of 1200 today, we have exported 45.3 kWh (+$29.89), and imported 71.5 kWh (-$17.87) from the grid. This means that I am just over $12 in credit already after 6 days. I love it! Less of course the quarterly network service fee of around $50. Hopefully we should clock up enough credits to pay for that as well. With a decent system you can export quite a lot of electricity if you keep consumption down low during the day. We now operate all major electrical items after sunset, like the dishwasher, washing machine, and pool pump. This way, we get maximum export during the day, and draw on the cheaper energy during the night. Pretty crafty hey! If they are going to pay me good money for it, I might as well make the most of it. Will be able to pay the mortgage off quicker with the profits which is a bigger bonus.
So out with the old;
And in with the new.
Finally, a happy ending. Now I just have to hope that Powercor took a final reading off of the old meter and passed it to Origin, or they will have no point of reference for my bill when they read this new one in three months time. Luckily, Kim took a photo of the old meter (above) before Powercor disconnected it! Thank goodness that I am a member of the ATA as I read about this tip in ReNew magazine about a year ago. It pays to take every precaution after all the stuff ups so far.
Oh, by the way. Origin/Powercor have already tried to charge us for the replacement meter which Powercor said they would waver. We set them straight on that one as well after another rocket down the phone! Will they ever learn what good customer service is?
Tree Huggin Momma says
Good for you! I hope to install both solar and wind generators once the house is paid for (using the mortgage fee to pay for the panels and turbine). Until then I watch our consumption and purchase green energy.
belinda says
Congratulations,
I sure hope things are straight forward from here.
Kind Regards
Belinda
nevyn says
I love it when it’s a bright sunny day and you can almost hear all that electricity been sent back to the grid.
Music to my ears and jingling noises in my pocket.
I can’t believe the amount of drama you had getting things switched over. The biggest problem we had was holes been drilled through our ceiling when they were installing the brackets for the solar panels.
One day I hope we can go completely off the grid, that would be awesome.
wombat064 says
Congrats,
about bloody time they supplied you that meter
Kate says
No wonder the world is in such a mess when it is so hard to become green. Things are going to have to work better than this if Australia is going to have any chance of reducing carbon emissions any time soon. The talk is all about retrofitting the suburbs but if everyone has to fight as hard as you have Gavin, it will be one big government stuff up yet again. Congratulations for persisting and getting the job done properly.
GreenerMe says
Really great post Gav. I like your thinking i.e. not drawing power during the day but only at night to draw the cheaper energy and hence make more money from the system – hey there is nothing wrong with making money when it is sustainable!
Well done Gav. I am still waiting on my sustainability report from the Gov so I can work towards installing my solar electricity power. I will be re-reading all your posts before I sign anything.
Thank you
Clarisworkz says
Yep, this is what I’m aiming for. Being reliant on the sun, sky and earth to supply my basic needs 🙂
Linda says
Thanks Gavin, informative post but now I’m REALLY scared! We have had so many problems with our retailer already. After reading your post, I’d like to put YOU on the job of chasing them up if it doesn’t go smoothly! Thanks heaps.